Pickett County
The county field on this row is wrong, and we can show which one
One quarry is filed under this town — Fentress Quarry, working 10 people — and the record carrying it disagrees with itself. The node list names the county as Fentress. The coordinate reverse-geocodes to Pickett County, and this town, which is the Pickett County seat, is in Pickett too.
Two of the three fields corroborate each other, so it is the county field that is the outlier. That matters more than a clerical detail: it establishes that the county field is not derived from the coordinate and can be wrong on its own, and any figure keyed to it — a county posting rate, a county rule — would describe the wrong county. Every county number on this page is computed from the coordinate instead.
There is a candidate explanation and it is offered as a hypothesis rather than asserted: the operator holds an approved state source 7.54 miles away, in the county the row names, while the pit itself is over the line in the adjoining one. The same shape has been measured before on portable registrations, where a county field recorded an operator’s administrative attachment rather than a machine’s location. The data does not distinguish that from a plain clerical error and we are not going to choose between them.
The road network
A ten-mile circle from this pit is nearly half in another state
That coordinate is also what puts the road figures across a border. Within ten miles of it the inventory records 77 structures — 44 from the Tennessee file and 33 from the Kentucky one — so the circle is computed from every state file with structures inside it rather than from this state alone.
Fourteen of the 77 are coded posted for load and 13 are coded below legal loads on the separate item-70 test, 5 of them county-maintained; the nearest is 1.78 miles out. The lowest rating at or above the eleven-tonne commercial floor is 20.4 metric tonnes, about 22.5 US tons, and it is set by a Kentucky structure 6.57 miles away. So the crossing that caps a loaded truck working out of this pit is not in this state at all.
That cap admits about 9.4 tonnes of stone over an empty tandem’s tare, which is generous by the standards of this batch. Read it as an upper bound rather than a guarantee: it is a minimum inside a ten-mile circle, and at most of the nodes on file a tighter crossing turns up somewhere between ten miles and twenty.
FHWA National Bridge Inventory 2025, Tennessee and Kentucky files, items 41, 64 and 70.
Where the record disagrees with itself
Two figures for the same circle, and we are not picking one
Those bridge numbers come with a caveat we would rather state than bury. The research bundle for this pit contains two counts of the same ten-mile circle and they do not agree. One says 14 posted structures out of 77 with the binding cap 20.4 tonnes set 6.57 miles away in Kentucky. The other says 2 posted structures with the binding cap 19.4 tonnes.
The likely reason is that one was computed across both state files and the other from the Tennessee file alone, which would explain the count but not settle the cap. We have used the cross-border figures above because they are the ones that describe the roads a truck here actually uses. We have not resolved the disagreement and we are not asserting that we have.
Either way the practical answer is the same: nothing within 1.78 miles of the pit stops a loaded truck, and the crossing that does is comfortably above the floor. The difference between 19.4 and 20.4 tonnes would not change a routing decision.
Tennessee weight law
Eleven trades get a margin. Stone is not one of them
Both readings sit under one statute, and it gives this trade nothing extra.
Tenn. Code Ann. § 55-7-203 sets 80,000 lb gross, 20,000 lb on a single axle and 34,000 lb on a tandem, with up to 550 lb more for emissions-reduction equipment. Subsection (b)(7) grants a ten per cent margin of error on the weighing to logging, sand, coal, clay, shale, phosphate, solid waste, recovered materials, farm trucks and machinery trucks — off the interstate system only. Crushed stone is absent, and so are limestone, aggregate and gravel.
§ 55-7-103 lets the department set a lower maximum between 15 January and 15 April, and at any other time for repairs, weather or recent construction, with a week’s notice posted at the termini of the road and at every detour.
And § 55-7-104 is the one that costs a working day: an overweight vehicle may not be moved until the load is reduced into compliance or a permit obtained, and failing to comply is itself a Class C misdemeanour.
Tenn. Code Ann. §§ 55-7-103, 55-7-104 and 55-7-203, as summarised by the University of Tennessee County Technical Assistance Service. Information, not legal advice.
Tennessee paperwork
We need a title — unless it never had one
Beyond the weight rules, the paperwork is one sentence.
Everything after that sentence is a fix rather than a category. A lost title has a counter replacement. Where none exists there is a bonded route. Neither one stops a sale.
The salvage rule is the one people repeat wrongly. Tennessee’s salvage and rebuilt part is built on the term passenger motor vehicle, and § 55-3-201 defines that as a vehicle ten model years old or less which, if it is a light-duty truck or a multipurpose vehicle, is rated at not more than nine thousand pounds gross.
So the seventy-five per cent threshold does not reach a truck rated above nine thousand pounds at any age, and does not reach a vehicle of any kind over ten model years old. Those limbs describe the class the part governs rather than exceptions inside it. Whether some other provision reaches such a vehicle was not determined and is not claimed here.
Tenn. Code Ann. § 55-3-201 and § 55-3-211, with the Tennessee Department of Revenue’s guidance. Information, not legal advice, and only as current as the day those were read.
What we buy here
Those rules cover every kind of iron we buy, and around a pit 4.64 miles from the middle of town that is a wide range. Tandem dumps and aggregate haulers off it. Articulated haulers and the plant trucks that move between jobs, including the 7.54 miles over to the operator’s other source.
Day cabs, road tractors, box trucks, straight trucks, flatbeds, rollbacks, tankers, service bodies, work trucks and pickups too — not a Pickett County thing in particular, they run everywhere, including across the line and back.
Whatever you drive, the offer doesn’t change. We buy all of them.
We buy complete trucks. If the engine, transmission, doors, rear ends, drive shafts, wheels or anything under the hood have been removed, we can’t buy it. Small things — a missing bumper — are fine.
Straight answers
The questions we get asked in Byrdstown
- Does it have to run?No. It does have to be complete — if the engine, transmission, doors, rear ends, drive shafts, wheels or anything under the hood have been removed, we can’t buy it. Rust is not a disqualifier.
- The engine is out of it. Is that different?Yes, and that is the line. A tired engine is fine; an engine that has been pulled and sold means we can’t buy the truck.
- What about the title?We need one unless the truck is old enough that it never had one. Lost titles have a counter replacement, and where none exists there is a bonded route.
- The paperwork has the wrong county on it.It happens, and it happened to the node list for this very pit. A county field that disagrees with a coordinate is a records problem rather than a title problem, and it does not stop a sale. Tell us where the truck is and we will work from that.
- It runs into Kentucky.Common here — 33 of the 77 structures within ten miles of the pit are in the Kentucky file, and the crossing that caps a load is one of them, 6.57 miles out. Crossing the line does not change whether we buy the truck.
- How do you pay?Cash or electronic payment, whichever suits you.
Why people call
None of that is usually the reason. The reasons here are ordinary ones. Retiring. A medical that went the wrong way. A job finishing and the plant that served it having nowhere to go next.
On a crew of 10 working a pit 4.64 miles out of town there is a sharper version: one person stops and a tenth of the operation stops with them, and the truck that person drove is standing the next morning with nobody to take it on. The 7.54 miles over to the operator’s other source will not absorb it.
Most of those aren’t happy reasons, and we don’t treat them like they are. Somebody wants a straight answer and the truck gone by the end of the week. That’s what we’re here for.